TRUSTED ELECTRICAL PARTNER

Service Panel Replacement & Upgrades — Chicago

Old, unsafe, or overloaded panels replaced by licensed electricians in a single day. Safer, more capacity, code-compliant.

Is Your Panel Still Safe?

Free on-site panel assessment — photos, documentation, and an honest recommendation with no pressure.

OLD PANEL? TIME TO REPLACE.

A Safer, Stronger Foundation for Your Home.

Your electrical panel is the heart of your home’s wiring. When it’s old, undersized, or a known-fire-hazard brand, every appliance, every EV charger, and every new circuit runs through a failing foundation. High Power Inc. replaces old and unsafe electrical panels with modern, code-compliant breaker boxes — sized for how your home actually uses power today, not what it needed in 1975.

Tech_with_laptop_and_tools_202606040158

When to Replace Your Panel

  • You have a fuse box: Most insurance companies now require an upgrade before renewing a policy on a home with a fuse box.
  • Federal Pacific, Zinsco, or Challenger panels: Documented breaker failure issues — widely considered fire hazards. Many insurers refuse coverage.
  • Breakers trip frequently: Consistently overloaded — or the breakers themselves are beginning to fail.
  • The panel is full: No empty slots for a new circuit — EV charger, addition, new appliance.
  • Rust, burn marks, or warm breakers: Active electrical problems requiring immediate attention.
  • You’re planning major upgrades: EV charger, hot tub, central AC, home addition, or generator.
  • You’re selling your home: Old panels appear on inspection reports and become negotiation blockers.

What a Panel Replacement Includes

  • Complete removal of existing panel · New main breaker panel (Square D, Eaton, or Siemens)
  • New breakers for every circuit · Reconnection and proper labeling of all circuits
  • Whole-house surge protection (available add-on — strongly recommended)
  • ComEd service disconnect and reconnect coordination
  • Permit filing with City of Chicago or municipality
  • Final inspection.
  • 100% guaranteed workmanship

How It Works

Step What Happens
1. Assessment
Inspect panel, service, and visible wiring — written quote provided.
2. Permit
We pull the required permit — typically 1–2 week lead time in Chicago.
3. Power Disconnect
We coordinate with ComEd for same-day service disconnect.
4. Panel Swap
4–8 hour job — most of the day without power; we start early.
5. Re-energize & Test
Power restored, every circuit tested individually, every breaker labeled.
6. Inspection
We meet the inspector — usually within a few days of installation.

Cost & Timeline

Most panel replacements range from $2,500 to $5,000 depending on panel size and existing wiring condition. Firm written quotes after an on-site visit. Timeline from signed contract to completed installation: typically 2–4 weeks — mostly permit lead time, with the actual install done in a single day.

Is Your Panel Still Safe?

Free on-site panel assessment — photos, documentation, and an honest recommendation with no pressure.

PC_building_desktop_laptop_repair_202606111256 (1)
PC_building_desktop_laptop_repair_202606111258
Scroll to top